We build fiber optic networks, execute civil works and install electrical grid infrastructure for Germany's leading telecom operators and utility networks — controlled by registered engineers from mobilization through to Abnahme.
Founded in January 2022 in Cologne, MCPOWER Europe GmbH has grown into a 26-person engineering organisation delivering end-to-end fiber optic, civil works and grid infrastructure across Germany.
What sets us apart is straightforward: every project is led by our own engineering organisation. Chamber-registered civil and electrical engineers carry technical responsibility from mobilization onward, and technical management and project accountability remain in-house through to the acceptance protocol.
Completed and signed-off projects are supported by documented regulatory handover records and associated protocols, available on request where appropriate.
Three integrated practice areas operated by one engineering management team, with design and supervision performed in-house. Civil, fiber and electrical acceptances are approved by the appropriately qualified in-house engineer — reducing interface risk across the project lifecycle.
FTTH, FTTX and FTTB design, deployment, splicing and acceptance documentation. From POP installation to OTDR-verified home connection.
Open trench, horizontal directional drilling (HDD) and full surface reinstatement on public roads — asphalt, concrete and cobblestone — with complete traffic management.
Underground LV/MV cable installation, substation works, cable jointing and earthing — under HWK Berlin certification. Full coordination with Netzbetreiber.
Five projects across three federal states, delivered or in delivery as sole subcontractor, approved supplier or subcontractor to the principal — under full engineering responsibility, with documentation maintained throughout.
Deutsche Telekom via Constructel GmbH · 2022–2023
Full FTTH deployment including Bönnigheim's historic Altstadt — combining asphalt road works with precision cobblestone reinstatement. Traffic management coordinated with the municipality throughout. Independent end-to-end execution as sole subcontractor.
Deutsche Telekom via Circet Germany · 2023–2024
Fiber optic expansion in rural and suburban zones north of Berlin. Ten kilometers required hand excavation in environmentally sensitive wooded areas — executed in coordination with local environmental authorities under full DIN compliance.
Westnetz GmbH via Vitronet · 2024 · Steinheim · Lügde · Dortmund
Civil works and surface reinstatement across three urban NRW locations as a Westnetz-approved supplier. Each site demanded active traffic management and strict NRW road authority compliance in restricted urban working space.
OXG programme via Geodesia Deutschland GmbH · 2025–2026
City-wide FTTH rollout delivered through Geodesia Deutschland GmbH within the OXG programme. Phase 1 has been completed and handed over section by section; Phase 2 is now under way, with OTDR test protocols and as-built documentation maintained per section.
Leonhard Weiss (principal contractor) · 2026–
FTTH civil works package covering trenching, duct installation and full surface reinstatement — asphalt, paving and kerb works — with active traffic management in residential streets. Further phases are foreseen under the same programme.
Project documentation is available under NDA where appropriate. As-built drawings, OTDR protocols, handover records and photo logs are available for completed and signed-off projects.
Submit a Pre-Qualification RequestA five-phase delivery model applied uniformly across every project since 2022. Documentation is treated as a primary deliverable — not a closing exercise. As-built drawings, OTDR protocols and compliance logs are compiled in real time, so acceptance preparation is never a back-end bottleneck.
Site assessment, resource planning and regulatory alignment with municipality, utility and traffic authorities.
Engineer-supervised fieldwork with defined quality checkpoints at each section closure.
KPI-driven progress tracking, cost control and early risk detection across all crews.
Continuous as-built records, OTDR test protocols and compliance logs maintained in real time.
Structured acceptance preparation — clean handover to the client as the working standard.
All three practice areas — fiber, civil and electrical — operate under one engineering management. Each acceptance is approved by the appropriately qualified in-house engineer, reducing the interface risk that comes with fragmented subcontractor packages.
Projects are managed against PMI-style performance indicators: scope fulfilment, schedule adherence, cost discipline and quality compliance. Internal reviews held weekly; client-facing progress reports issued in agreed cadence.
An owned plant fleet — excavators, drilling equipment, fiber splicers, OTDR equipment — limits rental dependencies, keeps crews and equipment aligned and allows MCPOWER to mobilize on short notice.
Controlled, accountable and documented delivery from mobilization onward. The differentiators below reflect the operating standards applied across our work.
Completed and signed-off projects are supported by maintained handover records, acceptance protocols and project evidence.
Chamber-registered civil and electrical engineers (IK-Bau NRW) carry technical responsibility from mobilization through Abnahme. Technical management remains in-house.
Mobilization → Execution → Monitoring → Documentation → Abnahme. Applied uniformly since 2022. Active subcontractor coordination at every stage.
PMI-aligned tracking across scope, schedule, cost and quality. Weekly internal reviews. Client-facing progress reports on agreed cadence.
Owned machinery for civil, reinstatement and fiber works. Core operations run on owned plant, keeping crews and equipment aligned.
Credit Index 284 with 1.74% probability of default (August 2025). Consistent payment record within agreed terms.
26 professionals across Cologne and Berlin. Engineering registrations covering NRW and Berlin. Capacity scales while maintaining quality standards.
Leadership with 10–20 years at Turkcell, Huawei, Ericsson and Vodafone — telecom infrastructure delivery across Türkiye, Germany and Qatar at operator, supplier and contractor levels.
Permit dependencies, scope ambiguities and resource constraints are identified early and managed through structured mitigation planning.
MCPOWER Europe is led by engineers with telecom infrastructure delivery experience across operator, supplier and contractor environments in Türkiye, Germany and Qatar. That perspective shapes every project decision.
M.Sc. Civil Engineering, Yıldız Technical University. Registered Civil Engineer with IK-Bau NRW since 2024. Founder and CEO of MCPOWER Global. 15 years of project management experience spanning fiber optic infrastructure, telecom and solar energy for Turkcell, Huawei and MEDAŞ. Delivered F/O backbone and FTTX programmes and a 3 MW solar EPC project in Türkiye before establishing the European operation.
Electrical-Electronics Engineer, registered with IK-Bau NRW. Operations Manager for Electrical Technicians under HWK Berlin certification. Ten years of hands-on experience in telecom and electrical infrastructure with Turkcell, Huawei and Aydem. Field-level expertise in MV/LV cable installation, substation works and grid connection — coordinates German electrical certification compliance across all MCPOWER projects.
B.Sc. Electrical-Electronics & Computer Engineering (double major), Anadolu University. PMP-certified with PM Cube modules in Finance, Supply, Governance and Leadership. Twenty years of project management experience at Ericsson, Vodafone and Turkcell — including Customer Project Manager for Ooredoo Qatar and CRA Qatar at Ericsson, and FTTH Project Manager at Vodafone Istanbul.
MCPOWER integrates site safety, environmental coordination and disciplined documentation into day-to-day delivery. Work methods, reinstatement activities and project records are planned around the applicable approvals, local conditions and client requirements.
Detailed project documentation, photo logs, OTDR test protocols, as-built drawings and acceptance certificates are available on request under NDA. Reference contacts can be facilitated upon mutual NDA.
Project as-built drawings, OTDR protocols, acceptance certificates and photo logs available under NDA. Address requests to the Managing Director directly.
Active projects may be visited by appointment after mutual coordination and project-level approval.
Reference documentation for completed and signed-off projects can be reviewed on request, subject to the applicable approvals and NDA requirements.